Date:22/06/20
In China, factory dynamic testing of a prototype magnetic cushion train was launched at a design speed of 600 km/h. The train moves in the air without touching the ground. Researchers conducted comprehensive tests of the test sample in various operating modes. The event marks a major breakthrough in the development of a high-speed levitation transport system, noted CRRC Qingdao Sifang.
Due to some design features, the levitating train on a magnetic pad makes very little noise while driving. The minimum turning radius is less than half the turning radius of ordinary metro trains, so transport will be more maneuverable.
Sansan noted that the high-speed transport system with magnetic levitation includes such subsystems as traction power supply, communication-based train control, and rail track.
The development project started in July 2016. The research involved more than 30 enterprises, universities, and research institutes from different regions of the country. A prototype magnetic cushion train was manufactured at the CRRC Qingdao Sifang Co-production line in May of this year.
China is testing a “flying” train
In China, began testing a train on a magnetic cushion, which moves through the air without contact with the ground. The project was launched by CRRC Qingdao Sifang Co in Shanghai. Information about this appeared in the Xinhua News Agency.In China, factory dynamic testing of a prototype magnetic cushion train was launched at a design speed of 600 km/h. The train moves in the air without touching the ground. Researchers conducted comprehensive tests of the test sample in various operating modes. The event marks a major breakthrough in the development of a high-speed levitation transport system, noted CRRC Qingdao Sifang.
Due to some design features, the levitating train on a magnetic pad makes very little noise while driving. The minimum turning radius is less than half the turning radius of ordinary metro trains, so transport will be more maneuverable.
Sansan noted that the high-speed transport system with magnetic levitation includes such subsystems as traction power supply, communication-based train control, and rail track.
The development project started in July 2016. The research involved more than 30 enterprises, universities, and research institutes from different regions of the country. A prototype magnetic cushion train was manufactured at the CRRC Qingdao Sifang Co-production line in May of this year.
Views: 381
©ictnews.az. All rights reserved.Similar news
- Azerbaijani project to monitor disease via mobile phones
- Innovative educational system to be improved under presidential decree
- NTRC prolongs license of two TV and radio organizations for 6 years
- Azerbaijan establishes e-registry for medicines
- Azerbaijani museum introduces e-guide
- Nar Mobile opens “Nar Dunyasi” sales and service center in Siyazan city
- International conference on custom electronic services held in Baku
- OIC secretary general to attend COMSTECH meeting in Baku
- Azerbaijan develops earthquake warning system
- New law to regulate transition to digital broadcasting in Azerbaijan
- Azerbaijani State Social Protection Fund introduces electronic digital signature
- Intellectual traffic management system in Baku to be commissioned in December
- Tax Ministry of Azerbaijan started receiving video-addresses
- World Bank recommends Azerbaijan to speed up e-service introduction in real estate
- Azerbaijan to shift to electronic registration of real estate