12px13px15px17px
Date:17/09/12

New “Avikon-02” units introduced at Baku Underground Railroad to enhance safety of passengers

New equipment and software support was installed in the Baku Underground Railroad in order to enhance safety of passengers.  This information was provided to ICTnews by the Baku Underground Railroad.

According to this information,  a large-scale rail-welding project has been implemented in the Baku Underground Railroad to this end. Under the project, the last version of a hand-held unit “Avikon-02” was introduced in the rail-welding plant. “Avikon-01 mp” and “Avikon-11” units, previously used at the Baku Underground Railroad, could not fulfill all requirements.

The new “Avikon-02” unit can check condition of rails and automatically draw up statements by means of a special program. Different parameters can be entered into the program, which includes 12 indicators: calibration method, tuning,  degrees, etalons and the others. Upon entering the required parameters into the program by the operator, the unit draws up a statement and shows defects and faults if there is any.    




Views: 719

©ictnews.az. All rights reserved.

Facebook Google Favorites.Live BobrDobr Delicious Twitter Propeller Diigo Yahoo Memori MoeMesto






23 November 2024

22 11 2024